OpenLNS CT User’s Guide 223
4. Click OK.
You can update the recovery data in the physical devices in a network after setting the subsystem
recovery options and after recovering a network. To update the recovery data, follow these steps:
1. Click Add-ins, point to Synchronization, and then click Resynchronize. The Synchronize
OpenLNS CT Drawing dialog opens.
2. Under L
ONWORKS Network, select the Update Location Path and ID in Devices check box
(this option is only available if at least one of the subsystem recovery options is selected). Click
Next. The Choose Synchronization Scope dialog opens.